About LightEdge St. Louis
LightEdge St. Louis is a colocation data center operated by Lightedge at 210 N. Tucker Blvd. in St. Louis, MO. It's one of 7 facilities we track in the St. Louis market, a tier 2 market. The building is a carrier hotel that also houses Netrality Data Centers, so cross-connects to Netrality Data Centers stay in the building.
The building is 442,837 sq ft, with 2,700 sq ft of colocation space. The site has 0.4 MW of critical IT power. UPS redundancy is N+1 and generators are N+1.
47 carriers are available.
Worth knowing: A 2,700 sq ft LightEdge suite inside one of St. Louis's main interconnection buildings. Strong for network reach, tiny for growth.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
LightEdge St. Louis key details
LightEdge St. Louis compliance
Lightedge reports these certifications and attestations for LightEdge St. Louis. Ask for current reports during your evaluation.
LightEdge St. Louis location
- Address
- 210 N. Tucker Blvd., St. Louis, MO 63101
- Building
- 210 N Tucker
LightEdge St. Louis specifications
Checked against Lightedge’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00849
Power
Network
Building
Is LightEdge St. Louis the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Lightedge before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Network-heavy workloads in a carrier hotel with 47 carriers
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
In this building and nearby
Explore
Work at Lightedge? Send corrections or new specs.