About Iron Mountain BOS-1
Iron Mountain BOS-1 is a colocation data center operated by Iron Mountain Data Centers at 171 Bearfoot Rd in Northborough, MA. It's one of 15 facilities we track in the Boston market, a tier 2 market.
The building is 22,000 sq ft, with 10,000 sq ft of colocation space. The site has 3.6 MW of total power. UPS redundancy is 2N and generators are 2N. Cooling is Waterless cooling; concurrently maintainable.
Security includes two-factor access and three-factor to data floor.
3.6 MW capacity; concurrently maintainable; Starline busway distribution; cloud on-ramps to AWS and Azure via metro fiber.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Iron Mountain BOS-1 key details
- Building size
- 22,000 sq ft
- Colocation space
- 10,000 sq ft
- Total power
- 3.6 MW
- Critical IT power
- Not published
- Availability
- 1.2 MW offered today, 3.6 MW potential per Iron Mountain
- Provider
- Iron Mountain Data Centers
- Market
- Boston
- Type
- Retail colocation
- Specs checked
- November 2026
- Networks in PeeringDB
- 1 networks, 0 exchanges
Networks at Iron Mountain BOS-1
1 network lists a presence here in PeeringDB, the public database where networks record where they peer. It’s self-reported, so confirm the carrier you need is live in the building before you sign.
See all 1 network
Iron Mountain Data Centers.
Source: PeeringDB, November 2026.
Iron Mountain BOS-1 compliance
Iron Mountain Data Centers reports these certifications and attestations for Iron Mountain BOS-1. Ask for current reports during your evaluation.
Iron Mountain BOS-1 location
- Address
- 171 Bearfoot Rd, Northborough, MA 01532
- Building
- 171 Bearfoot Rd
- Map
- View on map
Iron Mountain BOS-1 specifications
Checked against Iron Mountain Data Centers’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00537
Power
Cooling
Network
Security
Building
Is Iron Mountain BOS-1 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Iron Mountain Data Centers before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 20 kW per rack
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Racks top out around 20 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Boston
Explore
Work at Iron Mountain Data Centers? Send corrections or new specs.