About CoreSite BO1 Boston
CoreSite BO1 Boston is a colocation data center operated by CoreSite at 70 Inner Belt Road in Somerville, MA. It's one of 15 facilities we track in the Boston market, a tier 2 market. The building also houses Expedient, so cross-connects to Expedient stay in the building.
The building is 273,000 sq ft. UPS redundancy is N, N+1, 2N.
On-site interconnection includes Any2Exchange and MASS-IX. Security includes key cards, biometric scanners, controlled site access and perimeter and interior IP-DVR cameras.
Diverse utility feeds.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
CoreSite BO1 Boston key details
CoreSite BO1 Boston compliance
CoreSite reports these certifications and attestations for CoreSite BO1 Boston. Ask for current reports during your evaluation.
CoreSite BO1 Boston location
- Address
- 70 Inner Belt Road, Somerville, MA 02143
- Building
- 70 Inner Belt Road
- Map
- View on map
CoreSite BO1 Boston specifications
Checked against CoreSite’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00064
Power
Network
Security
Building
Is CoreSite BO1 Boston the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with CoreSite before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- AI and GPU deployments and liquid cooling available
- Network-heavy workloads with on-site peering at Any2Exchange and MASS-IX
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
In this building and nearby
Explore
Work at CoreSite? Send corrections or new specs.