Evocative BOS1 Boston is a colocation data center operated by Evocative in Boston, MA. It's one of 15 facilities we track in the Boston market, a tier 2 market.
The building is 46,000 sq ft, with 21,600 sq ft of colocation space. The site has 6 MW of total power. UPS redundancy is 5 x 750 kVA GE UPS and generators are N+1 (3 x 2 MW). Generator runtime is 48 hours at 100% load. Cooling is 6 x 150-ton, N+1; 900 gpm closed loop pump room N+1. Racks support up to 20 kW.
Security includes 24x7x365 access control and surveillance and monitoring.
6 MW total utility power; 2 x 13.8 kV diverse feeds; high-density configurations to 20 kW.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Evocative BOS1 Boston key details
Evocative BOS1 Boston compliance
Evocative reports these certifications and attestations for Evocative BOS1 Boston. Ask for current reports during your evaluation.
Evocative BOS1 Boston location
- Address
- Boston, MA
Evocative BOS1 Boston specifications
Checked against Evocative’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00431
Power
Cooling
Security
Building
Is Evocative BOS1 Boston the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Evocative before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 20 kW per rack
- Regulated workloads that need SOC 2, PCI DSS and HIPAA
Insider advice
- Racks top out around 20 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- An SLA credit is a slice of one month's bill. It won't cover your lost revenue, so judge the facility on its incident history, not its credit schedule.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.