Get Quotes
  1. Markets
  2. Toronto
  3. STACK TOR01 Toronto

STACK TOR01 Toronto Data Center

Toronto, ON, Canada

OperationalSTACK InfrastructureTorontoSTACK Infrastructure site

  • Retail colocation
  • Verified November 2026

About STACK TOR01 Toronto

STACK TOR01 Toronto is a colocation data center operated by STACK Infrastructure in Toronto, ON. It's one of 32 facilities we track in the Toronto market, a tier 2 market.

The building is 592,000 sq ft. The site has 56 MW of critical IT power. UPS redundancy is N standard; N+1 block redundancy optional and generators are N standard; N+1 block redundancy optional. Generator runtime is minimum 24 hours of fuel storage. Cooling is Closed-loop water cooling; supports liquid-to-chip.

Worth knowing: Fed by three diverse Toronto Hydro substations and supports liquid-to-chip.

  • Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
  • Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
  • We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.

STACK TOR01 Toronto key details

Building size
592,000 sq ft
Colocation space
Not published
Total power
Not published
Critical IT power
56 MW
Availability
48 MW expansion (TOR01B and TOR01C) backed by committed Toronto Hydro power
Market
Toronto
Type
Retail colocation
Specs checked
November 2026

STACK TOR01 Toronto compliance

STACK Infrastructure hasn't published certifications for this facility. We'll request SOC 2, ISO 27001, PCI DSS and HIPAA reports with your quote.

STACK TOR01 Toronto location

Address
Toronto, ON, Canada

STACK TOR01 Toronto specifications

Checked against STACK Infrastructure’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00839

Power

Critical IT power56 MW
UPS redundancyN standard; N+1 block redundancy optional
Generator redundancyN standard; N+1 block redundancy optional
Generator runtimeMinimum 24 hours of fuel storage

Cooling

Cooling redundancyClosed-loop water cooling; supports liquid-to-chip
Renewable energy100%

Network

Connectivity2 main distribution frames with diverse fiber entrances; minutes from 151 Front Street

Security

Fire suppressionVESDA dual smoke detection; dual-interlock pre-action sprinklers

Building

Facility typeColocation
Building size592,000 sq ft
Flood plainTRCA-designated area of minimal flood hazard

Is STACK TOR01 Toronto the right fit?

Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with STACK Infrastructure before you commit.

Where it fits

  • Cabinets, cages and smaller suites, with the services a retail colocation customer expects
  • AI and GPU deployments and liquid cooling available

Insider advice

  • Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
  • Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
  • No compliance reports are published. Request a current SOC 2 Type II report before you sign.
  • Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.

Nearby in Toronto

ColoCrossing Toronto151 Front Street West, Toronto, ON
Not published
Verified Nov 2026
Cologix TOR1 Toronto151 Front Street West, Toronto, ON
Not published
Verified Nov 2026
Cologix TOR2 Toronto905 King Street West, Toronto, ON
Not published
Verified Nov 2026
Cologix TOR3 Toronto905 King Street West, Toronto, ON
Not published
Verified Nov 2026
All Toronto Data Centers