Equinix SJ1 Data Center
7 McIntosh Street, Saint John, NB E2K5B7
About Equinix SJ1
Equinix SJ1 is a colocation data center operated by Equinix at 7 McIntosh Street in Saint John, NB. It's one of 1 facilities we track in the Saint John market, a tier 3 market.
It offers 5,403 sq ft of colocation space. UPS redundancy is N+1 and generators are N+1. Generator runtime is 30 hours or more at full load. Cooling is N+1.
Security includes on-site security, combination and entrance mantraps.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Equinix SJ1 key details
- Building size
- Not published
- Colocation space
- 5,403 sq ft
- Total power
- Not published
- Critical IT power
- Not published
- Availability
- Not published
- Provider
- Equinix
- Market
- Saint John
- Type
- Retail colocation
- Specs checked
- November 2026
- Networks in PeeringDB
- 0 networks, 0 exchanges
Equinix SJ1 compliance
Equinix reports these certifications and attestations for Equinix SJ1. Ask for current reports during your evaluation.
Equinix SJ1 location
- Address
- 7 McIntosh Street, Saint John, NB E2K5B7
- Building
- 7 McIntosh Street
- Map
- View on map
Equinix SJ1 specifications
Checked against Equinix’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00393
Power
Cooling
Security
Building
Is Equinix SJ1 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Equinix before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Regulated workloads that need SOC 2, ISO 27001 and PCI DSS
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- It's built above the 100-year flood elevation. Ask about the 500-year line and where generators and switchgear sit.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.