About Lightedge Phoenix
Lightedge Phoenix is a colocation data center operated by Lightedge at 120 E Van Buren St. in Phoenix, AZ. It's one of 35 facilities we track in the Phoenix market, a tier 1 market. The building is a carrier hotel that also houses Digital Realty, so cross-connects to Digital Realty stay in the building.
It offers 4,854 sq ft of colocation space. UPS redundancy is 2N.
44 carriers are available.
Worth knowing: A small LightEdge suite (about 5,500 sq ft) in a downtown Phoenix carrier building with 44 networks on net. Good for interconnection, not for growth.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Lightedge Phoenix key details
Lightedge Phoenix compliance
Lightedge reports these certifications and attestations for Lightedge Phoenix. Ask for current reports during your evaluation.
Lightedge Phoenix location
- Address
- 120 E Van Buren St., Phoenix, AZ 85004
- Building
- 120 E Van Buren
Lightedge Phoenix specifications
Checked against Lightedge’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00565
Power
Network
Building
Is Lightedge Phoenix the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Lightedge before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Network-heavy workloads in a carrier hotel with 44 carriers
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
In this building and nearby
Explore
Work at Lightedge? Send corrections or new specs.