About Evocative PHX1 Phoenix
Evocative PHX1 Phoenix is a colocation data center operated by Evocative in Phoenix, AZ. It's one of 35 facilities we track in the Phoenix market, a tier 1 market.
The building is 550,000 sq ft. The site has 69 MW of total power. UPS redundancy is N+1 and 2N options (2 x 600 kW) and generators are N+2 (20+ 2.0 MW generators). Cooling is DX cooling plus heat rejection, 22,000 tons.
Security includes 24x7x365 access control and surveillance and monitoring.
69 MW dedicated substation; PUE 1.15.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Evocative PHX1 Phoenix key details
Evocative PHX1 Phoenix compliance
Evocative reports these certifications and attestations for Evocative PHX1 Phoenix. Ask for current reports during your evaluation.
Evocative PHX1 Phoenix location
- Address
- Phoenix, AZ
Evocative PHX1 Phoenix specifications
Checked against Evocative’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00437
Power
Cooling
Security
Building
Is Evocative PHX1 Phoenix the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Evocative before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Regulated workloads that need SOC 2, PCI DSS and HIPAA
- Uptime-critical systems that justify fully redundant 2N power
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.