About EdgeConneX PHX01
EdgeConneX PHX01 is a colocation data center operated by EdgeConneX in Tempe, AZ. It's one of 35 facilities we track in the Phoenix market, a tier 1 market.
The building is 79,200 sq ft, with 17,300 sq ft of colocation space. UPS redundancy is Concurrently maintainable, minimum N+1 (PDU, UPS, generators). Cooling is N+1 CRACs in separate suites.
On-site interconnection includes DE-CIX, 48-IX and PHX-IX. 23 carriers are available.
Worth knowing: Unusually network-rich for an edge site: 23 networks including DE-CIX and local AWS and Azure on-ramps. EdgeConneX also holds 50+ acres in Mesa for build to suit.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
EdgeConneX PHX01 key details
- Building size
- 79,200 sq ft
- Colocation space
- 17,300 sq ft
- Total power
- Not published
- Critical IT power
- Not published
- Availability
- Not published
- Provider
- EdgeConneX
- Market
- Phoenix
- Type
- Retail colocation
- Specs checked
- November 2026
EdgeConneX PHX01 compliance
EdgeConneX reports these certifications and attestations for EdgeConneX PHX01. Ask for current reports during your evaluation.
EdgeConneX PHX01 location
- Address
- Tempe, AZ (near Arizona State University)
EdgeConneX PHX01 specifications
Checked against EdgeConneX’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00304
Power
Cooling
Network
Building
Is EdgeConneX PHX01 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with EdgeConneX before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 20 kW per rack
- Network-heavy workloads with 23 carriers and on-site peering at DE-CIX, 48-IX and PHX-IX
Insider advice
- Racks top out around 20 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Phoenix
Explore
Work at EdgeConneX? Send corrections or new specs.