About EdgeConneX MIA02
EdgeConneX MIA02 is a colocation data center operated by EdgeConneX in Miami, FL. It's one of 16 facilities we track in the Miami market, a tier 2 market.
The building is 65,518 sq ft, with 34,800 sq ft of colocation space. UPS redundancy is Concurrently maintainable, minimum N+1 (PDU, UPS, generators). Cooling is N+1 CRACs in separate suites.
8 carriers are available.
Worth knowing: The larger of EdgeConneX's two Miami sites (9 MW combined), with Megaport on net.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
EdgeConneX MIA02 key details
- Building size
- 65,518 sq ft
- Colocation space
- 34,800 sq ft
- Total power
- Not published
- Critical IT power
- Not published
- Availability
- Not published
- Provider
- EdgeConneX
- Market
- Miami
- Type
- Retail colocation
- Specs checked
- November 2026
EdgeConneX MIA02 compliance
EdgeConneX reports these certifications and attestations for EdgeConneX MIA02. Ask for current reports during your evaluation.
EdgeConneX MIA02 location
- Address
- Miami, FL
EdgeConneX MIA02 specifications
Checked against EdgeConneX’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00944
Power
Cooling
Network
Building
Is EdgeConneX MIA02 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with EdgeConneX before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 20 kW per rack
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Racks top out around 20 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Miami
Explore
Work at EdgeConneX? Send corrections or new specs.