About Switch Las Vegas Core
Switch Las Vegas Core is a colocation data center operated by Switch in Las Vegas, NV. It's one of 4 facilities we track in the Las Vegas market, a tier 2 market.
The site has 495 MW of total power.
Worth knowing: Switch's home campus, 5 ms from Los Angeles and 7 ms from The Citadel on Switch's own fiber. Nevada tax breaks lower the cost of equipment. Switch sells space by the cabinet up to whole halls, with up to 2 MW per cabinet, a 100% power uptime guarantee and 100% renewable power across its campuses. It markets its sites as Tier 5 Platinum, which is its own standard rather than an Uptime Institute tier, so compare designs on the actual redundancy, not the label.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Switch Las Vegas Core key details
Switch Las Vegas Core compliance
Switch reports these certifications and attestations for Switch Las Vegas Core. Ask for current reports during your evaluation.
Switch Las Vegas Core location
- Address
- Las Vegas, NV
Switch Las Vegas Core specifications
Checked against Switch’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00688
Power
Cooling
Building
Is Switch Las Vegas Core the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Switch before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Regulated workloads that need SOC 2 and ISO 27001
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.