- Markets
- Kansas City
- DataBank MCI2 Pine Ridge
DataBank MCI2 Pine Ridge Data Center
10605 W. 84th Terrace, Overland Park, KS 66214
About DataBank MCI2 Pine Ridge
DataBank MCI2 Pine Ridge is a colocation data center operated by DataBank at 10605 W. 84th Terrace in Overland Park, KS. It's one of 9 facilities we track in the Kansas City market, a tier 2 market.
It offers 11,510 sq ft of colocation space. The site has 2 MW of critical IT power. UPS redundancy is 2N. Cooling is N+1. Racks support up to 10 kW.
16 carriers are available.
Critical IT load 2 MW; 16 onsite carriers; air-cooled cabinets 10 kW+.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
DataBank MCI2 Pine Ridge key details
- Building size
- Not published
- Colocation space
- 11,510 sq ft
- Total power
- Not published
- Critical IT power
- 2 MW
- Availability
- Not published
- Provider
- DataBank
- Market
- Kansas City
- Type
- Retail colocation
- Specs checked
- November 2026
- Networks in PeeringDB
- 3 networks, 0 exchanges
Networks at DataBank MCI2 Pine Ridge
3 networks list a presence here in PeeringDB, the public database where networks record where they peer. It’s self-reported, so confirm the carrier you need is live in the building before you sign.
See all 3 networks
DataBank, Megaport Global Access, WANSEC.
Source: PeeringDB, November 2026.
DataBank MCI2 Pine Ridge compliance
DataBank reports these certifications and attestations for DataBank MCI2 Pine Ridge. Ask for current reports during your evaluation.
DataBank MCI2 Pine Ridge location
- Address
- 10605 W. 84th Terrace, Overland Park, KS 66214
- Building
- 10605 W. 84th Terrace
- Map
- View on map
DataBank MCI2 Pine Ridge specifications
Checked against DataBank’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00205
Power
Cooling
Network
Building
Is DataBank MCI2 Pine Ridge the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with DataBank before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 10 kW per rack
- Network-heavy workloads with 16 carriers
Insider advice
- Racks top out around 10 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Kansas City
Explore
Work at DataBank? Send corrections or new specs.