EdgeConneX DEN02 is a colocation data center operated by EdgeConneX in Denver, CO. It's one of 23 facilities we track in the Denver market, a tier 2 market.
The building is 115,500 sq ft. The site has 24 MW of total power. UPS redundancy is Concurrently maintainable, minimum N+1 (PDU, UPS, generators). Cooling is N+1 CRACs in separate suites.
Worth knowing: Next to DEN01 and fully controlled by EdgeConneX. Five planned halls, so this is the Denver growth option.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
EdgeConneX DEN02 key details
- Building size
- 115,500 sq ft
- Colocation space
- Not published
- Total power
- 24 MW
- Critical IT power
- Not published
- Availability
- Five planned 10,500 sq ft data halls, up to 24 MW N+1 per EdgeConneX
- Provider
- EdgeConneX
- Market
- Denver
- Type
- Retail colocation
- Specs checked
- November 2026
EdgeConneX DEN02 compliance
EdgeConneX reports these certifications and attestations for EdgeConneX DEN02. Ask for current reports during your evaluation.
EdgeConneX DEN02 location
- Address
- Denver, CO
EdgeConneX DEN02 specifications
Checked against EdgeConneX’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00943
Power
Cooling
Building
Is EdgeConneX DEN02 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with EdgeConneX before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 20 kW per rack
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Racks top out around 20 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Denver
Explore
Work at EdgeConneX? Send corrections or new specs.