- Markets
- Dallas-Fort Worth
- DataBank DFW7 LBJ
DataBank DFW7 LBJ Data Center
6606 LBJ Freeway, Suite 145, Dallas, TX 75240
About DataBank DFW7 LBJ
DataBank DFW7 LBJ is a colocation data center operated by DataBank at 6606 LBJ Freeway in Dallas, TX. It's one of 76 facilities we track in the Dallas-Fort Worth market, a tier 1 market.
It offers 16,070 sq ft of colocation space. The site has 0.9 MW of critical IT power. UPS redundancy is 2N. Cooling is N+1. Racks support up to 10 kW.
37 carriers are available.
Critical IT load 0.94 MW; 40 onsite carriers; air-cooled cabinets 10 kW+.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
DataBank DFW7 LBJ key details
- Building size
- Not published
- Colocation space
- 16,070 sq ft
- Total power
- Not published
- Critical IT power
- 0.9 MW
- Availability
- Not published
- Provider
- DataBank
- Market
- Dallas-Fort Worth
- Type
- Retail colocation
- Specs checked
- November 2026
DataBank DFW7 LBJ compliance
DataBank reports these certifications and attestations for DataBank DFW7 LBJ. Ask for current reports during your evaluation.
DataBank DFW7 LBJ location
- Address
- 6606 LBJ Freeway, Suite 145, Dallas, TX 75240
- Building
- 6606 LBJ Freeway
DataBank DFW7 LBJ specifications
Checked against DataBank’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00181
Power
Cooling
Network
Building
Is DataBank DFW7 LBJ the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with DataBank before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Enterprise workloads and moderately dense racks, up to 10 kW per rack
- Network-heavy workloads with 37 carriers
Insider advice
- Racks top out around 10 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Dallas-Fort Worth
Explore
Work at DataBank? Send corrections or new specs.