About Iron Mountain WPA-1
Iron Mountain WPA-1 is a colocation data center operated by Iron Mountain Data Centers at 1137 Branchton Rd in Boyers, PA. It's one of 1 facilities we track in the Boyers market, a tier 3 market.
The building is 330,000 sq ft, all of it colocation space. The site has 15.5 MW of total power. UPS redundancy is N+1 and generators are N+1. Cooling is N+1 geothermal cooling via 100-acre underground reservoir.
Security includes 24/7/365 on-site monitoring and NOC, multi-factor authentication and metal detectors.
15.5 MW total capacity; A/B power feeds from First Energy; 100% matched renewable energy.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Iron Mountain WPA-1 key details
- Building size
- 330,000 sq ft
- Colocation space
- 330,000 sq ft
- Total power
- 15.5 MW
- Critical IT power
- Not published
- Availability
- Not published
- Provider
- Iron Mountain Data Centers
- Market
- Boyers
- Type
- Retail colocation
- Specs checked
- November 2026
- Networks in PeeringDB
- 4 networks, 0 exchanges
Networks at Iron Mountain WPA-1
4 networks list a presence here in PeeringDB, the public database where networks record where they peer. It’s self-reported, so confirm the carrier you need is live in the building before you sign.
See all 4 networks
Armstrong Utilities, Inc, Iron Mountain Data Centers, Magna5, Unitas Global.
Source: PeeringDB, November 2026.
Iron Mountain WPA-1 compliance
Iron Mountain Data Centers reports these certifications and attestations for Iron Mountain WPA-1. Ask for current reports during your evaluation.
Iron Mountain WPA-1 location
- Address
- 1137 Branchton Rd, Boyers, PA 16020
- Building
- 1137 Branchton Rd
Iron Mountain WPA-1 specifications
Checked against Iron Mountain Data Centers’s website in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00547
Power
Cooling
Network
Security
Building
Is Iron Mountain WPA-1 the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Iron Mountain Data Centers before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Regulated workloads that need SOC 2, ISO 27001, PCI DSS and HIPAA
Insider advice
- Get usable kW per cabinet in writing. Providers quote breaker size, and a 30A 208V circuit delivers about 5 kW under the 80% rule.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Ask about priority fuel delivery contracts, not just tank size. In a regional outage, the sites with priority contracts get fuel first.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Explore
Work at Iron Mountain Data Centers? Send corrections or new specs.