Get Quotes
  1. Markets
  2. Boise
  3. ValorC3 BOI-1 Boise

ValorC3 BOI-1 Boise Data Center

10215 W Emerald St, Boise, ID 83704

OperationalValorC3 Data CentersBoiseValorC3 Data Centers site

  • Retail colocation
  • Verified November 2026
  • 1 compliance report

About ValorC3 BOI-1 Boise

ValorC3 BOI-1 Boise is a colocation data center operated by ValorC3 Data Centers at 10215 W Emerald St in Boise, ID. It's one of 3 facilities we track in the Boise market, a tier 3 market.

The site has 46 MW of total power and 1.2 MW of critical IT power. UPS redundancy is N+1 and generators are N+1. Generator runtime is 48+ hours at full load; fuel contracts in place. Cooling is N+1 CRAC; hot/cold aisle containment. Racks support up to 30 kW.

On-site interconnection includes Global Peer Exchange. Security includes 24/7 on-site support.

2 MW total building power; 1.15 MW critical IT load; 46 MW dedicated substation with 22 MW redundant; air-cooled up to 30 kW per rack; carrier neutral (Lumen, Zayo and others); new UPS, generators and CRAC units; private suites up to 750 kW across DC2 and DC3.

Worth knowing: An updated and upgraded facility that's very nice to tour, with good connectivity and a staff customers like. Built for enterprise retail colocation at standard densities, not high-density AI or GPU workloads.

  • Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
  • Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
  • We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.

ValorC3 BOI-1 Boise key details

Building size
Not published
Colocation space
Not published
Total power
46 MW
Critical IT power
1.2 MW
Availability
Not published
Market
Boise
Type
Retail colocation
Specs checked
November 2026
Networks in PeeringDB
2 networks, 1 exchange

Networks at ValorC3 BOI-1 Boise

2 networks list a presence here in PeeringDB, the public database where networks record where they peer. It’s self-reported, so confirm the carrier you need is live in the building before you sign.

See all 2 networks

Fatbeam, Z4 Internet.

Source: PeeringDB, November 2026.

ValorC3 BOI-1 Boise compliance

ValorC3 Data Centers reports these certifications and attestations for ValorC3 BOI-1 Boise. Ask for current reports during your evaluation.

SOC 2

ValorC3 BOI-1 Boise location

Address
10215 W Emerald St, Boise, ID 83704
Building
10215 W Emerald St

ValorC3 BOI-1 Boise specifications

Checked against ValorC3 Data Centers’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00757

Power

Total power46 MW
Critical IT power1.2 MW
UPS redundancyN+1
Generator redundancyN+1
Generator runtime48+ hours at full load; fuel contracts in place
Power distributionA+B redundant power to every cabinet
Power densityUp to 30 kW per rack

Cooling

Cooling redundancyN+1 CRAC; hot/cold aisle containment

Network

Internet exchangesGlobal Peer Exchange
ConnectivityCarrier-neutral; Cloud on-ramps

Security

Physical security24/7 on-site support

Building

Facility typeColocation
Seismic designOutside Wasatch Fault (STG-1)

Is ValorC3 BOI-1 Boise the right fit?

Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with ValorC3 Data Centers before you commit.

Where it fits

  • Cabinets, cages and smaller suites, with the services a retail colocation customer expects
  • AI and GPU deployments, with racks up to 30 kW
  • Network-heavy workloads with on-site peering at Global Peer Exchange

Insider advice

  • Liquid-cooled space is the scarcest in any market. Ask what's live today versus on the roadmap, and who owns the CDUs and the secondary loop.
  • Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
  • Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
  • Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.

Nearby in Boise

Ark Boise2653 S Victory View Way, Boise, ID
10,000 sq ft
N+1 UPS
Verified Nov 2026
Not published
Verified Nov 2026
All Boise Data Centers

Explore

Work at ValorC3 Data Centers? Send corrections or new specs.